Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

LHC-Logbook: 2 Shifts over Easter #137

Merged
merged 3 commits into from
Apr 3, 2024
Merged
Changes from 1 commit
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
Prev Previous commit
added ampdet
  • Loading branch information
JoschD committed Apr 2, 2024
commit 3b331f4096136ec1956970bc1b1e1e4521b8cb63
8 changes: 4 additions & 4 deletions docs/resources/logbook/2024_lhc.md
Original file line number Diff line number Diff line change
Expand Up @@ -30,9 +30,9 @@ The tables below can be sorted by clicking next to the column headers.
| 2024-03-18 22:40 | 2024-03-19 07:00 | 1WN | Commissioning | Nonlinear Corrections at 30cm - 2 | [Shift Plan](2024-03-18, 1081, 3988476){.logbook-link} / [Summary](2024-03-19, 1081, 3988607){.logbook-link} |
| 2024-03-22 07:00 | 2024-03-22 16:00 | 1W | Commissioning | Global Corrections in the Squeeze | [Shift Plan](2024-03-22, 1081, 3990992){.logbook-link} / [Summary](2024-03-22, 1081, 3991469){.logbook-link} |
| 2024-03-24 10:40 | 2024-03-24 19:15 | 1H | Commissioning | Measurements in the Ramp | [Shift Plan](2024-03-24, 1081, 3992589){.logbook-link} / [Summary](2024-03-24, 1081, 3992822){.logbook-link} |
| 2024-03-25 07:00 | 2024-03-25 15:16 | 0.3WN | Commissioning | Squeeze validation and NL optics | [Shift Plan](2024-03-25, 1081, 3993108){.logbook-link} / [Summary](2024-03-25, 1081, 3993341){.logbook-link} |
| 2024-03-31 12:00 | 2024-03-31 23:00 | 1.5H | Commissioning | NL at Injection and Ion Cycle | [Shift Plan](2024-03-31, 1081, 3996626){.logbook-link} / [Summary](2024-03-31, 322, 3996776){.logbook-link} |
| 2024-04-01 15:30 | 2024-04-01 23:00 | 1H | Commissioning | Squeeze 30cm-22cm | [Shift Plan](2024-04-01, 1081, 3996950){.logbook-link} / [Summary](2024-04-01, 1081, 3997092){.logbook-link} |
| 2024-03-25 07:00 | 2024-03-25 15:16 | 0.3WN | Commissioning | Squeeze validation and NL optics | [Shift Plan](2024-03-25, 1081, 3993108){.logbook-link} / [Summary](2024-03-25, 1081, 3993341){.logbook-link} |
| 2024-03-31 12:00 | 2024-03-31 23:00 | 1.5H | Commissioning | NL at Injection and Ion Cycle | [Shift Plan](2024-03-31, 1081, 3996626){.logbook-link} / [Summary](2024-03-31, 322, 3996776){.logbook-link} |
| 2024-04-01 15:30 | 2024-04-01 23:00 | 1H | Commissioning | Squeeze 30cm-22cm | [Shift Plan](2024-04-01, 1081, 3996950){.logbook-link} / [Summary](2024-04-01, 1081, 3997092){.logbook-link} |

<!-- Logbook Links: [LINK_NAME](date, logbook_id, event_id){.logbook-link} -->

Expand All @@ -50,6 +50,6 @@ The tables below can be sorted by clicking next to the column headers.
*[Measurements in the Ramp]: Measured the optics in the ramp, then down from 2m to 30cm. Beam 1 good. Beam 2 results in squeeze deviated from Friday due to an energy shift, which was fixed with a 1E-4 trim. New global corrections were determined and applied for Beam 2. Did some Kmod.
*[Squeeze validation and NL optics]: Validated optics from 60cm to 30cm. Some new corrections computed for 60cm. Validated K-mod at 60cm, 45cm and 30cm. Measured b4 corrections effect using flat orbit to kick as high as possible.
*[NL at Injection and Ion Cycle]: Tested MCD and MCOSX responses at Injection. Measured Ions at 1m and 50cm. Issues with K-mod.
*[Squeeze 30cm-22cm]: Squeezing down to 22cm and global corrections with K-mod.
*[Squeeze 30cm-22cm]: Squeezing down to 22cm and global corrections with K-mod and checking amplitude detuning.

--8<-- "docs/resources/logbook/footer_shifts"