Skip to content

Bump the test-dependencies group with 2 updates (#704) #74

Bump the test-dependencies group with 2 updates (#704)

Bump the test-dependencies group with 2 updates (#704) #74

Triggered via push March 4, 2024 10:27
Status Failure
Total duration 1m 34s
Artifacts

ci.yml

on: push
Matrix: integration-test
post-integration-test
20s
post-integration-test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
integration-test (heroku-20)
Process completed with exit code 1.
integration-test (heroku-22)
The job was canceled because "heroku-20" failed.
integration-test (heroku-22)
The operation was canceled.
post-integration-test
Process completed with exit code 1.